post angle concrete away from the sun

How to Install a Sun Shade Post - Stay Cool Guide

Hold the bottom corner of the spirit level at point A against the post. Keeping the spirit level vertical lean the post away from the center of the shade until the distance between points B and C is 3 1/2″ (9cm). Increasing the distance between B and C increases the angle; for ~10degree lean make the distance 7″ / 18cm. Concrete Mix and Pour

Get Price

How to Slope a Concrete Patio for Drainage | DoItYourself.com

Mix and Lay Concrete. Follow the instructions on your product and mix your concrete in a wheelbarrow. If you need to add a slope to a previously built concrete platform, you should still use wooden forms, like 2x4s, in order to make sure that the concrete lays evenly. Dig out the edges alongside your patio, and pound these into place.

Get Price

Installing a Fence Post on Angled Concrete Footing .

Position the post in the hole and make sure it is level. Place the concrete mix around the post and let the mortar cure. For the post holder, pour in the concrete into the hole up to a level one inch lower that the lower surface of the hole opening. Let the mortar cure for about a day or two.

Get Price

How to Cut Concrete (DIYer's Guide) - Bob Vila

A 7” circular saw, for instance, can only cut to 2-¼ inches deep, meaning you’ll need to sledgehammer the rest of the concrete away; a 14” wet-cutting blade attached to a concrete-cutting .

Get Price

Curing Concrete Dos and Don'ts - Bob Vila

DON’T let new concrete get too cold. The best time to pour concrete is when temperatures are expected to remain above 50 degrees for five to seven days, but plans can go awry with the arrival of .

Get Price

Most builders do it this way-how can it be wrong? - Charles .

I found this post very helpful. We are getting ready to do a concrete stoop outside of our kitchen door and it has the exact same configuration as shown here in your post. Do you have a picture of the ideal configuration described in your post. How do we properly pull concrete away from the kitchen wall and leave a clearance?

Get Price

Top 16 Mistakes People Make When Installing Concrete .

Concrete installation is not nearly as straightforward as it seems. There is a wealth of preparation that occurs before a single drop of concrete is ever poured onto the site. Everything from the mix design, quantity of concrete to purchase, site preparation, tools, weather forecast, placement process, form removal and curing process need to be … Continue reading "Top 16 Mistakes People Make .

Get Price

How to Slope a Concrete Patio for Drainage | DoItYourself.com

Mix and Lay Concrete. Follow the instructions on your product and mix your concrete in a wheelbarrow. If you need to add a slope to a previously built concrete platform, you should still use wooden forms, like 2x4s, in order to make sure that the concrete lays evenly. Dig out the edges alongside your patio, and pound these into place.

Get Price

How to Cut Concrete (DIYer's Guide) - Bob Vila

A 7” circular saw, for instance, can only cut to 2-¼ inches deep, meaning you’ll need to sledgehammer the rest of the concrete away; a 14” wet-cutting blade attached to a concrete-cutting .

Get Price

Where Do I Position My Two Post Lift In My Garage? | GSES

Is the concrete only a "slab" or was this concrete poured inside a "footing"? What is the thickness of the concrete? Bottom line: If you drill too close to the edge, the concrete will break apart. A concrete slab will be more susceptible to breaking at the edges than concrete that is poured inside a footing.

Get Price

Shading | YourHome

Adjustable shading is recommended for these elevations as they receive a combination of high and low angle sun throughout the day. Typical responses for northern and eastern or western elevations need to be integrated. Select systems that allow the user to exclude all sun in summer, gain full sun in winter, and manipulate sun levels at other times.

Get Price

Top 16 Mistakes People Make When Installing Concrete .

Concrete installation is not nearly as straightforward as it seems. There is a wealth of preparation that occurs before a single drop of concrete is ever poured onto the site. Everything from the mix design, quantity of concrete to purchase, site preparation, tools, weather forecast, placement process, form removal and curing process need to be … Continue reading "Top 16 Mistakes People Make .

Get Price

Shade Sails - Installation Tips

poured concrete. Insert the post with a hold down bolt through the post to keep it secure. (see diagram) Pour the concrete footing and temporarily brace the posts until the concrete has set. Wood Post Footing - Lay a 4 in (100mm) depth of 3/4 in diameter gravel at the base of the post. Insert the posts using lag bolts partially driven into the

Get Price

How Much Slope Should A Patio Have? | Captain Patio

The drain should be placed close to where the standing water is collecting. You can mark this location and use a jackhammer to dig up the pavement. Once the concrete is removed, you will dig a trench until it can hold a two-inch layer of sand and the drain channel. The sand should be sloped away from the house at the rate of one inch per 20 feet.

Get Price

Deck Layout and Footing Position Spacing | DIY Deck Plans

A span is the unsupported distance between two posts. A “cantilever” is the unsupported end of a joist that extends past the last support post at the edge of your deck. Maximum joist span of a 2X8 is 10’ – 6” at 16” o.c. Maximum cantilever of a 2X8 is 24” at 16” o.c. Maximum cantilever of a double 2X8 beam past a support post is .

Get Price

Product Details

Product List